Call a Specialist Today! (02) 9388 1741

Vess A3340Pd
Surveillance Solution for Mid-Sized Businesses


Surveillance Solution for Mid-Sized Businesses

Promise Products
Vess A3340 Series
Optimized for video surveillance Error-free video recording Powered by SmartBoost Technology
#VESSA3340PD
Our Price:

Click here to jump to more pricing!

Please Note: All Prices are Inclusive of GST

Overview:

Surveillance Solution for Mid-Sized Businesses

Vess A3340 is ideal for small-to-mid-sized video surveillance installations; reliable, high performance, easy to deploy and maintain. Certified and verified by the most popular VMS in surveillance industry with proven installations worldwide. Offering more diversified combinations of Intel Core and Xeon CPU options to create a high performance solution that easily handles the various surveillance system demands. Vess A3340 models are available with a single Power Supply Unit (PSU) or redundant PSUs. A redundant PSU guarantees system function if the PSU fails. Data on the Vess A3340 and additional capacity Vess RAID Storage systems are protected by PromiseRAID.

Vess A3340 2U 8-bay surveillance storage appliance

Features Summary

  • Ideal for mid-sized video surveillance installations.
  • Reliable, cost-effective and easy to deploy and maintain.
  • Powerful solution that enables it to easily handle the intensive demands of the latest VMS and analytics.
  • Perfect for up to 80 IP cameras.
  • Out of the box solution.
  • 3 year warranty – can extend to 5 years.
  • 2U 8-bay rackmount chassis.
  • Ideal for banks, casinos, prisons, schools, transportation, city surveillance, public facilities, government.

Features:

Why Promise Vess Storage Appliances?

The Promise Vess Series of Storage appliances are reliable integrated server and storage solutions for IP video surveillance. Vess Storage appliances are open platform solutions that can be deployed with any of the leading IP cameras and video management software (VMS) for installations of any size.

Linux OS deployment support icon

More Flexible Deployment with Linux OS Supported

  • Linux users now have more options for their surveillance system deployment. Promise Vess A Series supports Linux distributions on select Vess A models for surveillance networks running Linux-based VMS in the back-end system*.
*The supported Linux distributions is listed on the datasheet and please contact your channel partners if you need others.
Scalable all-in-one storage appliance icon

All-in-One Server and Scalable Total Solution of Storage Appliance

  • Reduces maintenance and service costs.
  • Easily expand via iSCSI by adding Promise storage.
VMS integration and SDK support icon

Purpose Built for Surveillance and Highly Integrated Capability

  • SDK library available for VMS UI & Management Integration.
  • Supports to develop VMS plug-in enabling it to be managed via VMS interface.
Modularized design serviceability icon

Simplified Management and Serviceability

  • Modularized design and One Plug Auto Service simplifies maintenance and tech support workflow.

Certified by Surveillance Partners

Vess A3340 storage appliances are fully compatible with a range of IP cameras and world-clasee VMS from vendors including Aimetis, Axxonsoft, Digifort, Genetec, OnSSI, SeeTec, Sony and Milestone..etc. The strong partnership will insure the customers will enjoy the well-rounded intergration and outstanding performance.

Certified surveillance VMS and camera partners

SMARTBOOST™ Technologies

PROMISE proprietary SMARTBOOST™ Technology provides the most stable and high performance storage solution for your surveillance system. Performance that can be limited by storage equipment bottlenecks is significantly improved by Promise SMARTBOOST™ Technology. With the optimized software features and FRU hardware design, you have the best stability and storage performance with the best C/P ratio.

Predictive playback icon

Predictive Playback

Utilizes idle recording times to monitor read patterns to predict where the next playback will be needed so the hard disk drives are not competing with the workload of the system.

Remote active service icon

Remote Active Service

Takes all worries away by proactively detecting when PSU, controllers or HDDs are going into critical condition and automatically notifying user the hardware status. A huge advantage in installations with site restrictions, such as banking, as it not only saves maintenance costs but also the headaches caused when outside support personnel need access to restricted areas.

Sequential pattern recording icon

Sequential Pattern Recording

Eliminates the heavy workloads caused by random write patterns; this feature monitors recording patterns and collects data in the cache buffer and writes data to the drives once a full stripe is ready. This creates a sequential recording pattern which offers the smoothest performance.

Simplified Planning

With just a few clicks of the Promise Surveillance Planner, export the report of the suggested products for your project, simplify efforts of planning your surveillance project.

Surveillance Planner simplified project planning

Specifications:


Vess A3340Pd Specifications
Camera Range¹ 80
Form Factor 2U, 19" Rackmount
Number Of Drives 8 Drives
Drive Type Hot Swappable 3.5" Enterprise SATA HDD 6Gbs. Optional 2.5" Enterprise SATA SSD
Internal Storage M.2 PCIe NVMe SSD 256GB (Standard) or M.2 256GBx2 OS RAID (Optional)
System Processor Intel® Xeon® E-2226GE
System Memory 2 x 16GB DDR4 Default (Max 64GB)
Storage Expansion Optional PROMISE Vess R and Vess J series via iSCSI
Network Interface 2 x Gigabit Ethernet
USB Ports Front: 2 x USB 3.0, Back: 4 x USB 3.0, 2 x USB 2.0
PCI Express Slots 1 x PCIe3.0 x8 Low profile
1 x PCIe3.0 x4 Low profile (available only when OS RAID card is not present)
Graphic Interface 1 x D-sub VGA, 1 x Display Port, 1 x HDMI™
Audio I/O 3 x 3.5mm Audio Jack
Optical S/PDIF Yes
RAID Levels 0, 1, 1E, 3, 5, 6, 10 (0+1), 30, 50, 60 (Any combination can be configured simultaneously)
Hot spares Multiple global or dedicated hot-spare drives with revertible option
Supported OS (64-bit) Windows 10, Windows 11, Windows Server 2019, Windows Server 2022, Ubuntu, Rocky
Management Tools/Interface Graphical UI/SNMP via Ethernet, CLI via Ethernet or Graphics, OPAS Service via USB, SDK or API for Integration
Surveillance Optimization SMARTBOOST™ Storage for Video Surveillance optimization
Event Notification Email, SNMP (V1/V2/V3), Buzzer, LEDs
AC Input 100 ~ 240 VAC, 60 ~ 50Hz
Current (Maximum) <8A @ 100-240Vac @full load
Power Supply Hot Swappable 80 PLUS Platinum 550W Redundant Power Supply
Temperature 5° ~ 40°C (-40° ~ 60°C non-operational)
Dimensions 85 x 447 x 410 mm / 3.35" x 17.60" x 16.14"
Weight W/o HDD :~12.75kg (~28.10 lbs), W/ HDD: ~18.50kg (~40.80 lbs)
Warranty 3-years standard warranty, optional extended warranty, and on-site parts replacement program (PROMISE ServicePlus) available.
Support 24/7 PROMISE eSupport Portal (support.promise.com), optional 24/7 phone and email support available.

Documentation:

Download the Vess A3340Pd (.PDF)

No PDF plugin? You can download the PDF.

Pricing Notes:

Custom Configurations

Looking for more configuration options or custom setups? Our team can help you find the right solution based on your requirements.

Contact Us

Bulk Purchase Support

Need multiple devices for your business or project? Contact us to discuss bulk pricing, availability, and delivery options.

Contact Us
Promise Products
Vess A3340 Series
Optimized for video surveillance Error-free video recording Powered by SmartBoost Technology
#VESSA3340PD
Our Price: